The Hotness
Games|People|Company
Through the Ages
The Witcher 3: Wild Hunt
A Brief History of the World
Mass Effect
Star Wars: Knights of the Old Republic II – The Sith Lords
Portal 2
Twilight Struggle
Outlast
Sentinels of the Multiverse
Outlast: Whistleblower
Coup
Terra Mystica
Super Mario World
Ninja Gaiden (2004)
Star Wars: Knights of the Old Republic
Phoenix Wright: Ace Attorney
The Legend of Zelda: A Link to the Past
Planescape: Torment
Endless Ocean: Blue World
Sid Meier's Colonization
The Elder Scrolls III: Morrowind
The Sims 2
The Sims 2: Pets
The Sims 2: Apartment Life
The Sims 2: Family Fun Stuff
The Sims 2: Mansion & Garden Stuff
Fantasy General
Shadow of the Beast (1989)
Karateka (1984)
Operation Darkness
Streets of Rage 2
Oddworld: Abe's Oddysee
The Legend of Zelda: Skyward Sword
Grid Runner
The Elder Scrolls III: Morrowind – Game of the Year Edition
Outside the Scope of VGG
Ninja Gaiden (1988 / Arcade)
Torchlight II
Ascension: Chronicle of the Godslayer
Realm of the Mad God
Grand Theft Auto V
Artemis: Spaceship Bridge Simulator
Dominion Online
Tomb Raider (2013)
Final Fantasy XV
Final Fantasy XIV: A Realm Reborn
Pandemic: The Board Game
Age of War
DUELYST
Disney's Castle of Illusion Starring Mickey Mouse

Critical Path

Average Rating: 0.00/10
Video Game Rank: N/A
Macintosh Rank: N/A
Windows Rank: N/A
Information
Primary Name
Critical Path
Alternate Names
Platform
Genre
Theme
Mode
Minimum Players
1
Maximum Players
1
Release Date
1994-00-00
Developer
Publisher
 Corrections
 Customize View
xml RSS Feed 
Facebook Twitter Delicious Google
ObjectID: 209232
Releases
Pg. 1
Critical Path
Nick: 
Macintosh release
Rel Date: 1994-00-00
Publisher: Media Vision Technology
Macintosh
Developer: Mechadeus
Media: CD-ROM
Region: 
Rating: (Not Rated)
English
View
Corrections
Link Image
Critical Path
Nick: 
Windows release
Rel Date: 1994-00-00
Publisher: Media Vision Technology
Windows
Developer: Mechadeus
Media: CD-ROM
Region: 
Rating: (Not Rated)
English
View
Corrections
Link Image
Description Edit | History

Critical Path is a post-apocalyptic interactive movie adventure video game developed by Mechadeus (now Mondo Media) and published by Media Vision Technology. Critical Path featured real time video which made it appear to be graphically superior to most games of its time. In actuality, the entire game was an interactive movie, where most choices would simply cause the game to progress or end.

Plot
A terrorist biological warfare doomsday event has played out, killing off 90% of the world's population. Many of the survivors are sick or eventually become insane. A group of surviving soldiers attempt to care for survivors and maintain order on their military base. Over time, the situation gradually becomes so dire that the commander orders all sick transported 70 miles (110 km) away to an abandoned village, and orders his troops to open fire on anything within a 30-mile (48 km) radius.

Kat (Eileen Weisinger), a helicopter pilot, returns from a reconnaissance mission to find her military base destroyed. Nighthorse (Stuart W. Yee) suggests that it was done by a nuclear weapon launched by a Soviet "boomer". Weeks later, Grier (Al Qualls) makes contact with an island 300 miles (480 km) away, which reported to be clear of the sick and capable of receiving refugees. Nighthorse, Grier, Kat and the player, an unnamed soldier, set off in two AH-64 Apache attack helicopters.

En route, the helicopter carrying Grier and the player develops mechanical problems and require a replacement part had by the pair on the other helicopter. The player's helicopter is forced to set down on an island, landing on the rooftop of a factory compound. As Nighthorse and Kat circle, they are fired upon and shot down by a surface-to-air missile. Nighthorse is fatally wounded and orders Kat to deliver the part to the other team.

Kat makes her way to the compound entrance where she makes radio contact with the player, who is in a factory control room. The player relays his situation to Kat: Grier was dead while he was wounded and immobile. The pair had been caught in a booby trap when trying to enter the control room. The player can observe Kat's actions through a series of security cameras as well as Kat's camera headset. However, the headset is quickly damaged, and Kat can no longer receive audio signals from the player. Relying instead on sending simple instructions to Kat through a signaling keypad, the player must guide Kat through the factory to his position. Kat reveals that she has only nine bullets for her Uzi.

The player assists Kat as she makes her way through the factory by activating or deactivating machinery, relaying directional commands and setting off booby traps. The function of the various machinery and booby traps is hinted at in the deranged ramblings contained in a black notebook the player finds on the control room desk. As time passes, the identity of the facility's operator, General Minh (Min Yee) is revealed to the player, as is its function. At first blush, it appears as though Kat is making her way through a steel mill which manufactures large metal crosses. However, Kat eventually discovers a cross partially filled with a white powder she identifies as illicit drugs. She also discovers a torture chamber and meets a prisoner (Brian Bernasconi) who attempts to kill her for her gun. The player saves Kat by electrocuting the inmate who is sitting on an electric chair, and she moves on.

As Kat approaches the rooftop, she is confronted by Minh, carrying an M60 machine gun. The player successfully distracts Minh, while Kat shoots him and makes her way to the player. As the helicopter lifts off, Minh stands up and begins firing on the two as they hover. Kat aims a TV-guided missile at Minh and fires, and the helicopter veers away. Minh is killed in a flaming explosion and Kat, in her chopper, proclaims that she has ten lives and flies off victoriously into the sunset heading back to her military base and then home.

Source: Wikipedia, "[en.wikipedia.org/wiki/Critical_Path_%28video_game%29 Critical Path (video game)]", available under the CC-BY-SA License.

Characters
Pg. 1
No Character Found
More Information Edit | History
This page does not exist. You can edit this page to create it.
Updating...
Thumbs Up
Marketplace
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No items found
{{product.numforsale}} for sale {{product.price}}
{{product.prettycondition}}
{{product.listdate|truncate:"10"}}
Updating...
Thumbs Up
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No items found
{{item.title}} {{item.timeleft}}
{{item.currentprice}}
Updating...
Thumbs Up
Images
Gallery:
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No images found
Updating...
Thumbs Up
{{title}}
Category: Language:
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No videos found
{{video.numrecommend}} {{video.title}} {{video.language}} {{video.username|truncate:"10"}} {{video.numcomments}}
Updating...
Thumbs Up
{{data.config.moduletitle}} Relationship:
[] [Forums »] [Post »] [Search »]
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No threads found
{{thread.numrecommend}} {{thread.subject}}
Last Post {{thread.lastpostdate|truncate:"10"}} Posted {{thread.postdate|truncate:"10"}}
{{thread.user.username|truncate:"10"}} {{thread.numposts-1}}
Updating...
Thumbs Up
{{data.config.moduletitle}} Relationship:
[] [Forums »] [Post »] [Search »]
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No threads found
{{thread.numrecommend}} {{thread.subject}}
Last Post {{thread.lastpostdate|truncate:"10"}} Posted {{thread.postdate|truncate:"10"}}
{{thread.user.username|truncate:"10"}} {{thread.numposts-1}}
Updating...
Thumbs Up
{{title}}
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No posts found
{{post.numpositive}} {{post.title}}
by
{{post.numcomments}}
Files
Title | Hot | Recent
[Browse »]  [Upload File »] Language:
Pg. 1 of 1
No Files Found.
Updating...
Thumbs Up
GeekLists
[Browse »] [Summary »]
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No lists found
{{list.numpositive}} {{list.title}} {{list.username|truncate:"10"}} {{list.numitems}}
{{list.lastreplydate|truncate:"10"}} {{list.postdate|truncate:"10"}}
Statistics
Video Game Rank: N/A
Macintosh Rank: N/A
Windows Rank: N/A
Num Ratings: 0
Average Rating: 0.00
Standard Deviation: 0.00
Num Views: 42
GeekBuddy Analysis: Analyze
Similarly Rated: View
Avg. Game Weight: 0.0
Fans: 0
Personal Comments: 0
Users Owning: 0
Users Wanting: 0
Users Trading: 0 [find trade matches]
Has Parts For Trade: 0
Want Parts In Trade: 0
Price History: View
Total Plays: 0
Plays This Month: 0
Linked Items
Relationship: Sort: Genre: Theme: Mode: Media:
Pg. 1
No Items Found
Updating...
Thumbs Up
Web Links
Category: Language:
1 « Pg. {{module.params.pageid}} » {{data.config.endpage}}
No Web Links Found
Link {{cat}} {{lang}}
{{weblink.postdate|truncate:"10"}}
Tags
Your Tags: Add tags
Popular Tags: [View All]
User Information
Use this tool to rate games, save comments, and manage your collection.
Front Page | Welcome | Contact | Privacy Policy | Terms of Service | Advertise | Support BGG | Feeds RSS
Geekdo, BoardGameGeek, the Geekdo logo, and the BoardGameGeek logo are trademarks of BoardGameGeek, LLC.